The first step is to deploy the OVF package to our virtual environment. HP suggest 4 GB of RAM is needed for each cluster node. Note – If you are going to deploy the 3PAR Simulator with Remote Copy over IP (RCIP) the cluster node VMs will require more resources. 50GB disk space (full or thin-provisioned). The minimum system resources required for each VM are: Network configuration to enable communication between the three VMs. Requires deploying three VMs two VMs simulating the cluster nodes, a third VM to simulate the enclosure and private The 3PAR Simulator requires a VMware ESXi 5.x or a VMware Workstation 9 or 10 setup. Having fleshed out the HP documentation for deploying the 3PAR simulator on VMware ESXi I decided to take the plunge and do the same for the VMware Workstation deployment.įirst off I will be using some material from the previous post as once the deployment and configuration of Workstation is complete the remaining steps are the same.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |